Mar 24 2001
Progress update
The en-suite looks very bare (no floor!), I’ve just about worked out what to do with the plumbing and electrics so these should be done as soon as the windows arrive (hmmm, they seem to be late as well)
Mar 24 2001
The en-suite looks very bare (no floor!), I’ve just about worked out what to do with the plumbing and electrics so these should be done as soon as the windows arrive (hmmm, they seem to be late as well)
Feb 13 2001
I’ve recently started work on the house extension again. Our current en-suite is getting ripped out (I knew I could find a real job for that crowbar!). Got wet removing the sink taps (can’t I ever stay dry when plumbing?)
I didn’t realise how much internal work there would be! You need patient people around for if you plan to take as long as I did.