Mar 24 2001
Progress update
The en-suite looks very bare (no floor!), I’ve just about worked out what to do with the plumbing and electrics so these should be done as soon as the windows arrive (hmmm, they seem to be late as well)
Leave a Reply
You must be logged in to post a comment.