Aug 02 1999
Bricks arrive
After numerous delays, all 4700 bricks and 500 blocks have been delivered. Consequently, we are now 54″ higher than we were on the last report!
The delay in the bricks was merely down to the ‘rarity’ of them. Baggeridge had to make them before delivering them to the Matching Brick Company. Delivery delays ensued.
Leave a Reply
You must be logged in to post a comment.